During the last week we have been inundated with the guys involved with the build:
- Dive Compressor installation guys- Electrician x 2
- IT technician
- Engineering
- Shipwright
- Commissioning Team
- Project Manager
They have done a fantastic job working through the snagging list, sometimes we had three or four guys on the boat at any one time. We had a hilarious issue with the washer dryer that would not discharge; it turned out to have a polystyrene packing widget in the pipe. We had two small dings in table tops so they were removed and taken back to Wroxham to be re-sprayed. At the end of the week we had just 5 small things that will be fixed down the track.
And it begins - Andrew can't resist trying to figure out what's wrong with the washer! |
Alongside all this work we managed to have quite a bit of fun too.
Sandy and Brian dropped by - we met in Fremantle after they sailed in from Cape Town but originate from Ipswich |
Ruth & Duncan, Ipswich locals we met diving in the Philippines |
Everyday we watched these guys grow with confidence |
The sun came out for Nat & Jon's first trip aboard |
We weren't sure Jon was going to leave - a Dad and Son bonding moment reviewing electronics! |
Two great trips to the Butt & Oyster |
Sharing Oyster Champs |
The newest Oyster Owners |
No comments:
Post a Comment